Archives
December 2014
October 2014
June 2014
- Video: Mash Heat via HERMS coil
- Volume measurement electronics
- HERMS coil and volume measurement tube fitted
- Network up and linked to live web interface
- Chiller temperature sensors complete
- Upgrading the firmware
April 2014
- First wet test with mains water connected
- Mains electricity in and valve output hoses connected
- Mains water hooked up and chiller installed
January 2014
- Overall view January 2014
- Mash tun out sight tube
- Repairing a valve
- Temperature sensor setup
- Temperature sensors installed