High voltage wiring
27 Jan, 2013
The interior of the high voltage switching box mostly complete. This houses 3 SSRs for the two HLT elements and pump, low voltage relays for controlling the valves and a switch mode PSU for powering everything
27 Jan, 2013
The interior of the high voltage switching box mostly complete. This houses 3 SSRs for the two HLT elements and pump, low voltage relays for controlling the valves and a switch mode PSU for powering everything
01 Dec, 2012
Fitted the two HLT / kettle elements using the Qmax cutters. Also installed the stainless steel hop filter.
02 Apr, 2011
The other side of the story – lots of sketches, planning and muttering to myself.